BREEAM Reduction of energy use and carbon emissions
Contents |
[edit] Aim and benefits
This issue rates how well buildings have minimised energy demand, primary energy consumption and CO2 emissions. It only covers regulated energy (pre-2018), and so excludes external lighting, small power, and specialist equipment.
The aim of this credit is to encourage designers to take a holistic view to an efficient energy strategy in a building, rather than solely reducing energy (ENE 4 Passive Design) or replacing fossil fuels with renewables (ENE 4 LZC Feasibility).
This issue offers the following potential benefits to end users and clients:
- A higher EPC (for developments assessed under BREEAM 2008 or earlier) or Energy Performance Ratio (for development assessed under BREEAM 2011 or later) can lead to reduced runnning costs / energy bills and a lower carbon footprint over the life of the development;
- Facility for brand imaging / marketing of sustainability credentials;
- Increased building life before becoming obsolete; and
- Longer retention of tenants and higher yields.
[edit] What's the difference between the ENE 1 credits scored and Part L?
Part L is concerned solely with reducing CO2 emissions from a building. While there are limiting factors (e.g. minimum fabric efficiencies), it is entirely plausible to have a building that uses a large quantity of energy but off sets it all with renewables to comply with building regs.
ENE 01 balances reducing operational energy demand, primary energy consumption and CO2 emissions to give an "Energy Performance Ratio". The three graphs below show the the energy performance ratio given for each of these three elements for the percentage improvement over a notional building as read from the BRUKL compliance report. These figures apply to ENGLAND ONLY. This varies per country to account for the fact that some country's building regulations are more stringent than others.
The EPR for each element, is then added up to give an overall EPR which is compared to the ENE 01 credits table in the BREEAM manual. The ENE 01 calculator/scoring and reporting tool does this all for you, but sometimes it's handy to know the background. A spreadsheet has been included in the tools and resources section which contains the above graphs, if you find it helpful to get your head around the calculation.
As always, please only use official, up to date, BREEAM tools for calculating credit requirements etc.
So, as an example, if you have a building that uses a lot of energy for building services and doesn't have especially efficient fabric (e.g. only just meets building regulations for Primary Energy Consumption and Energy Demand), then the maximum credits you can get, regardless of how much energy offset by renewables is 5 UK New Construction 2014 credits. Note, in previous schemes additional requirements may mean 5 credits are not achieved.
[edit] When to consider
In the UK, RIBA Stages typically guide when things get done on a project. Standard RIBA Stage deliverables are as follows:
[edit] RIBA Stage 0 and 1
These stages are "Strategic Definition" and "Preparation of Brief". It's unlikely you'll get any solid information during these stages regarding credit targets. However, if your client has said that energy efficiency is a main priority for the project, you can probably assume you'll achieve more credits than if they're happy to scrape through building regs.
[edit] RIBA Stage 2
This stage is "Concept Design". Standard RIBA Stage 2 deliverables at this stage include conduction an initial Part L appraisal. While this might not finalise the number of credits you'll actually achieve (there's a lot of design changes to go yet!), it should give you a reasonable idea.
[edit] RIBA Stage 3
"Developed Design". An interim Part L report is often a deliverable from this stage. This will give you a better idea of the number of design stage credits you'll achieve. This may be the final Part L design stage report you get, depending on whether there are further design changes during RIBA Stage 4.
[edit] RIBA Stage 4
"Technical Design". At this stage, a full "as designed" Part L report should have been produced, and submitted to building control for approval. The report which is submitted to building control is pretty "safe" to use as your design stage evidence, providing it meets all criteria etc.
[edit] RIBA Stage 5
"Construction". Try to keep an eye on design changes as best as possible. If there's anything big relating to building fabric, heating/cooling systems or renewables ask for confirmation that there is no effect on Part L from the engineers.
[edit] RIBA Stage 6
"Handover and Close Out". Typically expect the final "as built" Part L report within about 30 days of practical completion.
[edit] Step by step guidance
Awaiting content
[edit] Questions to ask while seeking compliance
Awaiting content
[edit] Tools and resources
Guidance note explaining ENE 01 Methodology
Spreadsheet helping to explain ENE 01 Methodology for ENGLAND
BRE Knowledge Base related articles
[edit] Tips and best practice
Tip: Don't assume that a lovely fully naturally ventilated building will score better than a glass mechanically ventilated sky scraper. This credit still relies on a percentage improvement against a notional building. So as long as your mechanically ventilated glass box is better than the notional mech vent glass box, you can still score well in this credit (albeit you may score lower elsewhere).
[edit] Typical evidence
Awaiting content
[edit] Applicable Schemes
The guidelines collated in this ISD aim to support sustainable best practice in the topic described. This issue may apply in multiple BREEAM schemes covering different stages in the life of a building, different building types and different year versions. Some content may be generic but scheme nuances should also be taken into account. Refer to the comments below and related articles to this one to understand these nuances. See this document for further guidelines.
- UK New Construction 2014
BRE Global does not endorse any of the content posted and use of the content will not guarantee the meeting of certification criteria.
[edit] Find out more
Performance gap between building design and operation
Energy performance certificate EPC
Featured articles and news
What they are, how they work and why they are popular in many countries.
Plastic, recycling and its symbol
Student competition winning, M.C.Esher inspired Möbius strip design symbolising continuity within a finite entity.
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.
How neural technologies could transform the design future
Enhancing legacy parametric engines, offering novel ways to explore solutions and generate geometry.
Key AI related terms to be aware of
With explanations from the UK government and other bodies.
From QS to further education teacher
Applying real world skills with the next generation.
A guide on how children can use LEGO to mirror real engineering processes.
Data infrastructure for next-generation materials science
Research Data Express to automate data processing and create AI-ready datasets for materials research.
Wired for the Future with ECA; powering skills and progress
ECA South Wales Business Day 2025, a day to remember.
AI for the conservation professional
A level of sophistication previously reserved for science fiction.
Biomass harvested in cycles of less than ten years.
An interview with the new CIAT President
Usman Yaqub BSc (Hons) PCIAT MFPWS.
Cost benefit model report of building safety regime in Wales
Proposed policy option costs for design and construction stage of the new building safety regime in Wales.
Do you receive our free biweekly newsletter?
If not you can sign up to receive it in your mailbox here.